Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru

Construction projects often exceed budgets and deadlines, evidencing the need for collaborative methodologies such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM). This research evaluates their influence on the design stage of residential buildings through a case study i...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Tizon Checca, Delta Salome, Mamani Chambi, Ecler, Espinoza Vigil, Alain Jorge
Formato: Artículo
Lenguaje:inglés
Publicado: 2025
Materias:
Acceso en línea:Ver en el sistema de origen
Enlace permanente (DOI o Handle)
Enlace permanente (DOI o Handle)
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1881508957655138304
author Tizon Checca, Delta Salome
Mamani Chambi, Ecler
Espinoza Vigil, Alain Jorge
author_browse Espinoza Vigil, Alain Jorge
Mamani Chambi, Ecler
Tizon Checca, Delta Salome
author_facet Tizon Checca, Delta Salome
Mamani Chambi, Ecler
Espinoza Vigil, Alain Jorge
author_sort Tizon Checca, Delta Salome
collection Producción científica
description Construction projects often exceed budgets and deadlines, evidencing the need for collaborative methodologies such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM). This research evaluates their influence on the design stage of residential buildings through a case study in Peru, managed by an SME. The methodology includes: (1) diagnosis of management through documentary review and interviews, (2) proposal of tools based on BIM and IPD, and (3) validation through statistical analysis and a validation matrix. Nine typical problems were identified, such as deficiencies in plans, measurements and budgets, and poor planning. Eight optimization tools were proposed, including NEC4 ECC contracts, Trimble Connect, Revit, Navis-works, contractor integration, ICE Sessions, 3D, 4D, and 5D BIM models. The 3D model showed 0.48 interferences per m2, the 4D facilitated the monitoring of progress, and the 5D optimized costs by 5.28%. The validation process highlighted the NEC4 ECC Contract, the integration of the contractor, and the 3D and 5D BIM models (Revit and Navisworks) as the most effective tools. This study provides evidence on the implementation of BIM and IPD to optimize the management of residential buildings.
format Article
id oai:cris.upeu.edu.pe:20.500.15037/1524
institution UPeU
language English
publishDate 2025
publishDateRange 2025
publishDateSort 2025
record_format dspace
spelling oai:cris.upeu.edu.pe:20.500.15037/15242026-10-30T16:53:35ZOptimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in PeruTizon Checca, Delta SalomeMamani Chambi, EclerEspinoza Vigil, Alain Jorgeresidential buildingsintegrated managementBIM methodologyIPD methodologySMEinfrastructure managementConstruction projects often exceed budgets and deadlines, evidencing the need for collaborative methodologies such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM). This research evaluates their influence on the design stage of residential buildings through a case study in Peru, managed by an SME. The methodology includes: (1) diagnosis of management through documentary review and interviews, (2) proposal of tools based on BIM and IPD, and (3) validation through statistical analysis and a validation matrix. Nine typical problems were identified, such as deficiencies in plans, measurements and budgets, and poor planning. Eight optimization tools were proposed, including NEC4 ECC contracts, Trimble Connect, Revit, Navis-works, contractor integration, ICE Sessions, 3D, 4D, and 5D BIM models. The 3D model showed 0.48 interferences per m2, the 4D facilitated the monitoring of progress, and the 5D optimized costs by 5.28%. The validation process highlighted the NEC4 ECC Contract, the integration of the contractor, and the 3D and 5D BIM models (Revit and Navisworks) as the most effective tools. This study provides evidence on the implementation of BIM and IPD to optimize the management of residential buildings.Articlehttps://www.mdpi.com/2075-5309/15/6/901/pdf?version=1741868843https://doi.org/10.3390/buildings1506090110.3390/buildings15060901https://hdl.handle.net/20.500.15037/1524W4408405164enBuildings2075-53092025-03-132026-06-13T13:21:54Z2026-06-13T13:21:54Z
spellingShingle residential buildings
integrated management
BIM methodology
IPD methodology
SME
infrastructure management
Tizon Checca, Delta Salome
Mamani Chambi, Ecler
Espinoza Vigil, Alain Jorge
Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru
title Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru
title_full Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru
title_fullStr Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru
title_full_unstemmed Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru
title_short Optimizing Residential Buildings Desing Using Integrated Project Delivery (IPD) and Building Information Modeling (BIM): A Case Study in Peru
title_sort optimizing residential buildings desing using integrated project delivery ipd and building information modeling bim a case study in peru
topic residential buildings
integrated management
BIM methodology
IPD methodology
SME
infrastructure management
topic_facet residential buildings
integrated management
BIM methodology
IPD methodology
SME
infrastructure management
url https://www.mdpi.com/2075-5309/15/6/901/pdf?version=1741868843
https://doi.org/10.3390/buildings15060901
https://hdl.handle.net/20.500.15037/1524
work_keys_str_mv AT tizoncheccadeltasalome optimizingresidentialbuildingsdesingusingintegratedprojectdeliveryipdandbuildinginformationmodelingbimacasestudyinperu
AT mamanichambiecler optimizingresidentialbuildingsdesingusingintegratedprojectdeliveryipdandbuildinginformationmodelingbimacasestudyinperu
AT espinozavigilalainjorge optimizingresidentialbuildingsdesingusingintegratedprojectdeliveryipdandbuildinginformationmodelingbimacasestudyinperu